- Project Name: Jarrett Logistics
- Location: Orrville, OH
- Client: Freeman Building Systems
- Industry: Commercial Warehousing and Logistics
- Size: 105,000 sqft
Project Description: MIELKE constructed this Butler Pre-engineered metal Building for Freeman Construction. The structure measures 300′ x 350′ x 28′ High. Our team pre-assembled bays or “pods” on the ground and then used two cranes to simultaneously lift the pre-assembled units into place. This approach allows much more work to be completed on the ground in lieu of in the air; thereby greatly reducing safety risks and increasing efficiency. This logistics facility has 9- dock high doors and 2- 12’x14′ grade level doors.